SOME PROJECTS DONE


:: Parabe Platform Upgrade - for Cheveron
:: ATA Caison Wellhead Platform – For Tenoil
:: ADDAX Field KTMP – Platform Installation
:: Off-Shore (Addax Field) Diving Operations
:: Fabrication of Adanga North-B Caisson Guide – For ADDAX
:: Load out of Adanga North – A Guide Frame for ADDAX
:: ADDAX Field Topside Installation on Monopod (TPU)

:: ADDAX ADSI – Deck Load out
:: ADDAX Field (ADSI) – Platform Installation and Hydro Testing
:: 120 MMSCF Gas Metering Station EPCI
:: Equipment Fabricated for Gas Metering Station – Pressure Regulation Skid
:: EPCI Well Head Platform & Turbine & Metering Packages
:: Water Injection Platform – For AFREN
:: Delta Production Platform – CHEVRON
:: Load Out of Okoro Set – A Well Head Platform
:: CMES – Laydown Area
:: Calabar Lot 3 Gas Metering Station (NIPP/NDPHC (Power Project) CMES – Laydown Area
:: Calabar Lot 3 – 45KM Onshore 24” Pipe Laying Activity
:: Fabrication, Blasting, Painting, Installation and Commissioning of Lact Unit
:: NIPP/NDPCH – Power Generation Plant Calabar
:: AD22 to WI 7 Pipeline Installation